|
By:
the new housing is closing in on the old track.
|
|
By:
My confidence in the management is extremely low tbf, based on a reading of the formbook of false promises and closing tracks
|
|
By:
I can believe the new housing bit, sadly the new stadium bit, I would have some doubts over
![]() But one would hope for it, I don't know what attendances are like at existing track? |
|
By:
Bill says it's a January kick off for the new stadia. Has anybody booked a restaurant table for the opening night?
|
|
By:
Apologies, July.
|
|
By:
Please god it will happen,would be awesome if the build the track thats shown on the designs,a proper 480m trip similar to wimbledon its best described as,a much needed proper greyhound track!
|
|
By:
Can they get it done befor may
![]() |
|
By:
lol fatty,its still odds against it ever gets built im afraid but we gotta hope aint we!
|
|
By:
its in the racing post friday but you can read some of it now
|
|
By:
this mob closed mk and bristol
![]() |
|
By:
2016 start gets pencilled in for Swindon rebuild
SWINDON has outlined the timetable for its new track and now hopes to have it under way in the New Year. Bill Glass, Operations Director at Stadia UK said “We’re employing the latest building techniques which dramatically reduce the construction time and we have ensured throughout the design process that our greyhound and speedway racetracks will be built to the highest standards of construction, drainage and surfacing Wouldn't believe a word that C##T says |
|
By:
![]() they closed Reading as well |