<?xml version="1.0"?>
<rss xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
							<channel><title>New Posts For Thread: Wow an long odds on shot that takes a long lead and wins</title><link>https://community.betfair.com/horse_racing/go/thread/view/94102/31900943/wow-an-long-odds-on-shot-that-takes-a-long-lead-and-wins</link><description>Normally 33/1 shot that the fields leaves alone, and does not come back to the field.</description><item><title>Normally 33/1 shot that the fields leaves alone, and does not come back to the field.</title><link>https://community.betfair.com/horse_racing/go/thread/view/94102/31900943/wow-an-long-odds-on-shot-that-takes-a-long-lead-and-wins?post_id=565348107#565348107</link><description>Normally 33/1 shot that the fields leaves alone, and does not come back to the field.</description><pubDate>Fri, 01 May 2026 12:10:24 -0500</pubDate></item></channel></rss>
